Where: East Athens Community Park, Athens, GA (Driving Directions)
The Green loop and the Orange Crush loop are pretty much complete. Here's a trail map. The last thing we need to do is lay a little more gravel and tamp it all down really well. Bring a wheel barrow and a tamper if you have one. Don't worry, ACC will bring out a utility vehicle for the long haul on the upper Orange Crush loop. We'll only use wheel barrows for the short haul on the lower Green loop. As always, we will ride when we finish working. After we put the finishing touches on Green and Orange Crush, it's on to Phase 2 where we hope to build another 2 - 2.5 miles of trail by the end of the year. Bring gloves, water, and your bikes.